SCAQMD Amended Rule 1146.2 – Control of Oxides of Nitrogen (NOx) from Large Water Heaters, Small Boilers, and Process Heaters
June 20, 2024
*The information presented in this article is based on the SCAQMD Amended Rule 1146.2 language as of June 7, 2024. Please verify current guidelines and regulations independently.
The South Coast Air Quality Management District (SCAQMD) proposed amendments to Rule 1146.2 that affect industrial and other facilities. These changes aim to regulate nitrogen oxide (NOx) emissions from large water heaters, small boilers, and process heaters rated less than or equal to 2 million British thermal units (Btu) per hour. Adopted as of June 7, 2024, the amended rule establishes emission limits and compliance dates for existing equipment in a phased schedule based on equipment type, with a transition plan towards a zero-emission standard beginning in 2026.
Emission Limits and Compliance Dates
Rule 1146.2 categorizes large water heaters, small boilers, and process heaters into Type 1 and Type 2 units based on their heat input capacity. Type 1 units have a capacity of 400,000 Btu per hour or less, while Type 2 units range from 400,000 to 2,000,000 Btu per hour.
The amended rule aims to gradually phase out existing units and transition toward a zero-emission standard for future units through a scheduled compliance process. This process involves three phases of compliance based on equipment type, rating, and unit age.
Simply put, as equipment gets older, it will be expected to operate at zero emissions; once it reaches a certain age limit, based on its category, it will fall out of compliance. Unit age will be determined by its original manufacturing date, which can be validated through several means such as purchase invoices or nameplate information. Any unit age that is unable to be verified will be assumed at end of life by January 1, 2025.
The amended limits for both unit types are listed in Table 1 below.
Table 1: Emission Limits1
Equipment Category | NOx Emission Limit | CO Emission Limit |
---|---|---|
Type 1, Excluding Pool Heaters | 20 ppm @ 3% O2 | N/A |
Type 1 Pool Heaters | 55 ppm @ 3% O2 | N/A |
Type 2 Units | 20 ppm @ 3% O2 | 400 ppm @ 3% O2 |
1. Per Table 1 of Amended Rule 1146.2 posted June 7, 2024. |
The phases by equipment type are listed in Table 2 below.
Table 2: Compliance Schedule and Unit Age1
Equipment Category | Compliance Schedule | Compliance Date | Unit Age |
---|---|---|---|
Type 1 Unit2 | Phase I | New Buildings: January 1, 2026 Existing Buildings: January 1, 2029 |
15 |
Instantaneous Water Heater ≤200,000 Btu/hr3 | New Buildings: January 1, 2026 Existing Buildings: January 1, 2029 |
25 | |
Instantaneous Water Heater >200,000 Btu/hr3 | Phase II | New Buildings: January 1, 2028 Existing Buildings: January 1, 2031 |
25 |
Type 1 Pool Heater | New Buildings: January 1, 2028 Existing Buildings: January 1, 2031 |
15 | |
Type 2 Unit4 | New Buildings: January 1, 2028 Existing Buildings: January 1, 2031 |
25 | |
Type 1 High Temperature Unit5 | Phase III | New Buildings: January 1, 2029 Existing Buildings: January 1, 2033 |
25 |
Type 2 High Temperature Unit5 | New Buildings: January 1, 2029 Existing Buildings: January 1, 2033 |
25 | |
1. Per Tables 2 and 3 of Amended Rule 1146.2 posted June 7, 2024. | |||
2. Referring to a Type 1 or 2 unit that is not a Pool Heater, High Temperature Unit, or Instantaneous Water Heater. | |||
3. Instantaneous water heater refers to a tankless water heater with rated heat capacity <2,000,000 Btu that heats water only on demand. | |||
4. Referring to a Type 2 Unit that is not a High Temperature Unit or Instantaneous Water Heater. | |||
5. High Temperature Units are defined as units designed to produce steam or water above 180 degrees Fahrenheit. |
Retrofit and Burner Replacement
Operators can choose to modify current units with a certified retrofit kit and demonstrate, through an independent source test, that these upgrades meet the standards set out in the amended rule.
Additionally, if a unit has its burner replaced or modified before the compliance deadline and before reaching maximum unit age allowed for its category, it will be required to meet the NOx and CO limits outlined in Table 1. The unit’s age is based on date of manufacture and the installation of a new burner does not represent a new unit under the amendments being discussed.
Recordkeeping Requirements
The rule amendments will require equipment owners to maintain certain records, which include:
- Records of the manufacturer’s and/or distributor’s written instructions, maintenance activity, and fuel usage for a period of no less than 3 years;
- A copy of a government-issued document that grants permission to initiate a construction project (which can determine the eligibility of a new building or an existing building in compliance with this rule);
- A copy of the manufacturer’s or distributor’s manual or invoice;
- Documentation of the rated heat capacity of the unit; and/or
- If the unit is modified, there needs to be documentation showing the new heat capacity of the modified unit, signed by the licensed person modifying the unit. This documentation should also describe the changes that were made, dates of modifications, and a calculation of rated heat input capacity.
Exemptions
The rule amendments also allow for several exemptions for specified situations, such as:
- Low-use exemptions for units installed before the rule’s adoption, meeting Table 1 emission limits:
- Units rated 1,000,000 to 2,000,000 Btu/hr using under 3,000 therms/year;
- Units rated 400,000 to 1,000,000 Btu/hr using under 2,000 therms/year;
- Low-use exemption for Type 2 units manufactured before January 1, 2000, using under 9,000 therms/year; and
- Units in residential structures and small businesses may also get an exemption, if registration and recordkeeping requirements are met.
Alternative Compliance Options
The amended rule also includes a few specific alternative compliance options for unique situations such as multiple units, utility delays, instantaneous water heaters, leased property extensions, and construction delays.
________________________
For more information and detail on the SCAQMD’s Amended Rule 1146.2, please visit the SCAQMD’s website: Amended Rule 1146.2 (aqmd.gov)
Yorke Engineering, LLC has assisted over 2,000 industrial and government facilities with EH&S permitting and compliance throughout California. Learn More here: Air Quality | Yorke Engineering, LLC (yorkeengr.com).
If you would like a proposal, click the button below.
View our informative archived Newsletters ...
SCAQMD
January 2023
September 2022
February 2022
September 2021
January 2021
August 2020
January 2020
September 2019
January 2019
August 2018
January 2018
August 2017
December 2016
August 2016
February 2016
August 2015
December 2014
September 2014
January 2014
February 2013
July 2012
February 2012
December 2011
August 2011
June 2011
January 2011
BAAQMD
September 2022
February 2022
September 2021
January 2021
August 2020
January 2020
September 2019
January 2019
August 2018
January 2018
August 2017
December 2016
August 2016
February 2016
August 2015
January 2015
August 2014
February 2014
January 2013
July 2012
December 2011
August 2011
SJVAPCD
September 2022
February 2022
September 2021
January 2021
August 2020
January 2020
September 2019
January 2019
August 2018
January 2018
August 2017
January 2017
August 2016
February 2016
August 2015
January 2015
August 2014
January 2014
February 2013
July 2012
February 2012
December 2011
August 2011